Tower Base Ready For Concrete

Finally got to this point  (see bullet point 4, below).  It seemed like the digging would never end, but it did and now the hole is ready for the concrete pour.

IMG_0058

One of the rebars is allowed to protrude upwards and will be bonded to the tower along with ground rods to make up the ground system. The rebar is the “ufer ground”.

 

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s